Contact Us

Address:
Torr International, Inc.
12 Columbus Street
New Windsor, NY 12553
USA

Tel: (845) 565-4027 or (845) 565-6637
Fax: (845) 561-7731
Toll Free: 1-888-622-TORR (1-888-622-8677)
Email: torr@torr.com

QUOTATION REQUEST

To request a quote for a custom system, please scroll down and complete the form fields the best that you can. While it is not required to complete every field, it is important to complete as much as possible to ensure your quote is for a system that will fill your needs.

We believe in fully understanding the customers' requirements before offering a solution. If you are not specific in completing this form, you will get a quote that may not include all of the functionality that you are looking for. If that is the case, we will then have to start the quote process over again... So please take the time to fill out the entire form!

 
Organization Name:
Contact Person: *
Address1:
Address2:
Phone: *
Fax:
Email Address: *
 
Describe your system in a few sentances or ask questions here:
 
PROCESS DETAILS:
What Processes do you want your system for?
 
Process description: Please include a brief description of the process you plan to perform
 
SUBSTRATE DETAILS
Substrate Size:
Substrate Quality:
Substrate Shutter Required:
Materials to be deposited:
Thickness Desired (Please specify units):
Uniformity Required (%) +/-3% +/-5%

If multilayer depositions are required give details:

Type of deposition:
Give Details. If Reactive Deposition is required, give details:
Any special requirements of the film:
 
SYSTEM REQUIREMENTS
 
Chamber requirements:
Chamber Size:
Chamber Shape:
Chamber Material:
Load Lock Chamber?
 
Viewport Requirements
Size:
Material:
Quantity:
Type of Lifting on Chamber/Top Plate
(only for cylindrical chamber):
 
 
Substrate Stage Requirements
Size
Temperature Celsius

Rotation (rpm)
Planetary
Multi Axis
Water cooled substrate stage?

Other requirements
 

Substrate Temperature Control?
Temperature (oC)
Uniformity (+/- oC)
Accuracy (+/- oC)

Simple
PID
Thickness monitor (specify type and requirements)
 
Sputtering Gun, Target/Source Requirements
Size
Standard
Magnetic UHF
Flex
Power Requirements
Gasses & Flow to be used:
Argon
Nitrogen
Oxygen
Micrometer valve MFC
 
Thermal Evaporation Requirements

Port
Quantity
Crucible
Capacity (cc)

Power (kW and V/A)
Type of control required Variac SRC
 
E-beam Evaporation
No of pockets
If other, specify
Liners Required?
If yes, please specify
Capacity (cc)
Power (kW)
Sweep Supply
Any other requirements
 
Vacuum System Requirements
Turbo-Molecular/Mechanical pump combination
Diffusion pump/Trap/Mechanical pump combination
Cryopump/Mechanical pump combination
Mechanical Pump Oil Seal or Dry
Ultimate (Base) vacuum required (Torr)
Process vacuum anticipated (Torr)
Pump down time (min)
Cleanliness/Contamination consideration
Gauge Range (Torr)
Full range
Capacitance Manometer
Extra ports required (explain)
Operation
Manual
Semi-Automatic
Computer-controlled
 
General
Expected Order Date (mm/dd/yyyy)
Training of your personnel is required.
Installation at your site required
Budget, if known ($US)
 
 

Home | Products | Quality | News & Events | About Us | Contact Us